SDTA PLTP UNIT - II STAR ENERGY GEOTHERMAL DARAJAT - II
Project Duration : 18 days (stream to stream)
Scope of Work : Turbine, generator, auxiliary, cooling system, instrument calibration, electrical generator testing and overhaul and repair.
Equipment & Tools : mechanical tool set, Power tool set, Measuring tools, Instrumentation tools, Electrical tools, Hydraulic tools, Hydro jet blaster, Sand blasting tools, 50 tons Balancing Machine.