ON GOING PROJECT : SHUT DOWN TURN AROUND (SDTA) GEOTHERMAL DARAJAT


ON GOING PROJECT : SHUT DOWN TURN AROUND (SDTA) GEOTHERMAL DARAJAT

SDTA PLTP UNIT - II STAR ENERGY GEOTHERMAL DARAJAT - II

Project Duration : 18 days (stream to stream)
Scope of Work : Turbine, generator, auxiliary, cooling system, instrument calibration, electrical generator testing and overhaul and repair.

Equipment & Tools : mechanical tool set, Power tool set, Measuring tools, Instrumentation tools, Electrical tools, Hydraulic tools, Hydro jet blaster, Sand blasting tools, 50 tons Balancing Machine.
ON GOING PROJECT : SHUT DOWN TURN AROUND (SDTA) GEOTHERMAL DARAJAT
Turbine Generator Inspection
With Capacity 115 MW
FUJI Electric Turbine Generator
ON GOING PROJECT : SHUT DOWN TURN AROUND (SDTA) GEOTHERMAL DARAJAT
Steam Turbine Inspection
With Capacity 115 MW
Mitsubishi Heavy Industries Steam Turbine